Current status of project: 
This past week we­ spent a lot of time doing research to prepare for our progress report.  We have worked to come up with a design that we feel best fits the criteria with which we have to work with.  We split the project up into three different sections and were each assigned a section to research.  The three sections were: methods and locations to measure temperature, power requirements needed to work the system, and how the alert system would function.  We held multiple group meetings this week to combine our information and to decide on a final design.  We communicated with Marc Schmidt, filled out a non-disclosure agreement, and were able to receive some CAD drawings. 

Work planned for next week:
This week we plan on meeting multiple times to complete our progress report due on Wednesday.  On Wednesday, Norman will give the progress report presentation.  Although much of the research is done, we still need to bring all of our information together to get a complete final design. 

Anything needed from client or TA or instructor to continue work: 
None


Comments are closed.